Builder and homeowner reviewing renovation work in progress in a Manchester house

Finding a builder is easy. Finding a good one is the hard part, because the people who do a poor job are often the ones with the slickest quote and the earliest start date. This guide walks through the process in the order you will actually meet it, with the checks that matter and the ones that do not.

Why You Have to Do the Checking

In the UK there is no general licence for builders. Anyone can put up a website, order a van sign and call themselves a builder, so nobody is screening them on your behalf. A few areas are regulated: gas work must be done by a Gas Safe registered engineer, and electrical work in a home must comply with Part P of the Building Regulations, usually through a registered electrician. Everything else (structural work, plastering, tiling, general building) relies on the builder's own standards and on the checks you make.

That sounds worrying, but it makes the process simple. You are not looking for a magic certificate. You are looking for a company that is real, insured, has done this type of job before, and is happy to prove all of it in writing.

Where to Find Builders Worth Calling

Start with sources where someone has already put their name behind the builder:

Be careful with cold callers, door knockers and anyone who says they have "materials left over from another job". Reputable builders are usually booked ahead and do not need to chase work from your doorstep.

What to Check Before You Ask for a Quote

Do these checks before you spend time on a visit. Each takes a few minutes and can rule a company out quickly.

CheckHow to do itWhat good looks like
Company detailsSearch the company name on Companies House (free). Look at when it was set up and whether accounts are filed.A registered company or clear sole-trader details, a real address, and a track record that matches what they tell you.
Public liability insuranceAsk for the certificate and read the dates and the cover level.In date, covers your type of work, and a sensible level of cover for the size of job.
Employers' liabilityAsk if they employ anyone. If they do, ask for this certificate too.A valid certificate. It is a legal requirement for businesses with staff.
Gas workAsk for the engineer's Gas Safe ID card, then check the number on the Gas Safe Register.The card matches the person, and the register shows the type of gas work they are allowed to do.
Electrical workAsk which scheme the electrician is registered with (for example NICEIC or NAPIT) and check it on the scheme's site.A registered electrician who will issue an electrical certificate when the work is done.
Trade body or guaranteeIf they claim FMB, TrustMark or similar membership, check the member directory yourself.Listed on the official site, and clear on what the guarantee actually covers.

Also ask who will actually be on site. Some companies employ their own tradespeople, others subcontract everything. Neither is automatically wrong, but you should know which you are getting and who your single point of contact is. The longer version of this conversation is in our 10 questions to ask a renovation company.

How to Compare Quotes Properly

Get at least three written quotes, and make sure each is based on a visit to your home. A quote given from a phone call or a few photos is a guess, and guesses get corrected later at your expense.

If you want a rough idea of what the numbers should look like before quotes arrive, our cost guides for kitchens, bathrooms, loft conversions and extensions give a Manchester-specific starting point.

References and Seeing Finished Work

Photos are easy to borrow. Evidence is harder to fake. Ask for two or three recent customers you can actually contact, ideally from jobs similar in size to yours, and ask the builder for permission to visit one finished project if the owner is happy for you to do so.

When you speak to a past customer, ask practical questions:

Payment, Contracts and Your Rights

This is where most expensive mistakes happen, so slow down here even if you are in a hurry to start.

Put it in writing

A proper contract or written agreement should cover the scope of work, the price, the payment schedule, the start and expected finish dates, how changes are agreed and priced, who clears waste, and what guarantee applies. Model contracts from bodies such as the FMB are written for exactly this.

Pay in stages, not up front

A deposit of around 10% is common. Be wary of anything above 25% without a clear reason such as made-to-order materials, and walk away if you are asked for half upfront. Tie later payments to finished stages of work. Some homeowners also hold back a small retention, often 2.5% to 5%, until snagging is done a few months after completion.

Think about how you pay

Paying by credit card for part of a job may give you extra protection under Section 75 of the Consumer Credit Act for purchases between £100 and £30,000, and card payments are easier to dispute than cash or a transfer. Be cautious with last-minute changes to bank details sent by email or text. Phone the builder on a number you already trust before paying.

Know your cancellation rights

If you sign a contract in your own home or away from the business premises, you will usually have a 14-day cooling-off period. If the builder starts work during that period, you need to ask for it in writing, and you may have to pay for work already done. Check the cancellation wording in the paperwork before you sign.

Keep the paperwork afterwards

Ask for completion certificates where they apply: gas safety, electrical certificates, building control sign-off and any guarantee documents. You will want them when you sell the house.

Manchester Specifics to Raise Early

Greater Manchester has its own quirks, and a builder who works locally will mention them before you do.

Red Flags

Any one of these is worth a pause. Several together mean you should walk away:

If It Goes Wrong

Even with good checks, projects occasionally hit trouble. The order that usually works best:

  1. Document everything. Take dated photos, keep messages, and write down what was agreed and what is outstanding.
  2. Raise it in writing. Describe the problem, what you want done and by when. Keep the tone factual.
  3. Use the complaints route. If the builder belongs to a trade body or guarantee scheme, they will have a complaints process you can use.
  4. Get advice. Citizens Advice can explain your options and pass concerns to Trading Standards.
  5. Consider formal routes. A card chargeback or Section 75 claim may be possible if you paid that way, and the small claims court deals with disputes up to £10,000 in England and Wales.

Do not pay for work that has not been done, and get a second builder to assess the state of the job before anyone else starts correcting it. If the builder has gone bust or disappeared, an insurance-backed guarantee, if one was arranged, is what protects your deposit. It is one of the best reasons to ask about guarantees before you sign anything.

A Simple Order to Follow

  1. Shortlist from recommendations and vetted schemes
  2. Check company details, insurance and registrations
  3. Get three written, itemised quotes from site visits
  4. Speak to two or three recent customers
  5. Agree a written contract with staged payments
  6. Keep a contingency and keep all the paperwork

Whoever you hire, use this list on them. We are happy for you to use it on us too.

Once you have chosen someone, our renovation order of work and checklist shows the sequence the project should follow and the checks to make between stages.